Bahrain International Circuit

Client: Ministry of Works & Housing
Consulting Engineer:
Tilke An Partners
Main Contractor:
CEBARCO WCT WLL
Location:
Sakhir, Bahrain
Contract Period:
16 Months
Contract Completion:
March 2004
Value:
US $ 150,000,000

Description:

Bahrain International Circuit is recognized as the fasted “Rock to Race” F1 project ever constructed. From the first rock blast to the start of the Bahrain F1 was an incredible 483 days.

The project was extensive and covered all aspects of construction, including:-
• Main grandstand with VIP suites and commentator booths
• VIP tower 8 storey.
• Pit building, Paddock Club, race control, and winners podium
• Multipurpose building with grandstand, pits, and VIP suites.
• Media centre for 500 journalists.
• Medical centre.
• Plant building, maintenance centre, workers lodgings, water treatment plant.
• Entrance gatehouse, large car parking and helicopter landing pads.
• Extensive use of Teflon membrane roofing on all structures.
• 5.412Km F1 race track complete with all safety installations, inner and outer circuits, testing oval, and dragster track.
• Special electronics including timing, cameras, track signaling, PABX, LAN, security, fire alarm, etc
• Other works included; service roads, landscaping, HV distribution, fire hydrants, sewers, drainage, concrete paddock area, pavements, flood lighting, signage to name but a few.

The project was completed ahead of schedule and officially opened by His Majesty the King of Bahrain in March 2004.